Solar park with 880 trackers and 8,184 MWp, in the assembly phase, in Flix (Ribera d'Ebre). Running since 2007. Ebre Renovables does the maintenance work.
Partial view of the solar park, where some of its 880 trackers can be seen facing the sun.Maintenance is key to its good operation.
Partial view of the solar park in the spring.Nature and the trackers of the solar park in harmonious coexistence.
Solar park with 96 trackers and 1.2 MWp, in Les Borges Blanques (Les Garrigues). Running since 2008.Ebre Renovables does the maintenance work.
Front view of one of the 96 trackers of the solar park, each with 70 photovoltaic modules.The park has 6,720 photovoltaic modules in total.
In the foreground, a field of almond trees that surrounds part of the perimeter of the solar park.In the background you may see a part of the 96 trackers of the park.
Solar park with 368 trackers and 4.48 MWp, in Flix (Ribera d'Ebre). Image of the assembly. Running since 2008. Ebre Renovables built this park.
Image of the assembly of one of the 368 trackers of the solar park, with a structure ready to install modules.Ebre Renovables maintains the park.
Partial image of the solar park, where some of the solar panels can be seen. The size of the trackers requires careful and professional assembly work.
Solar park with a fixed structure of 2.39 MWp, in Flix (Ribera d'Ebre). Ebre Renovables has carried out the assembly of the park up to the transformation centres.
Image of the placement of the supports for the assembly of modules (almost 5,000 concrete blocks).
Ebre Renovables was in charge of the placement.
Image of the assembly work on the 4,344 photovoltaic modules of the solar park.
Ebre Renovables was in charge of the assembly.